Nerla Air Vessel
Water Resources and Irrigation
Construction & Installation of Air Vessel (4 Nos.)
Read More
Shivnala Lift Irrigation Scheme
Water Resources and Irrigation
Shivnala LIS is an Engineering, Procurement and Construction
Read More
Chandur Railway Project (ROB)
Bridges/Railways / Metro Segment
Work of Construction of R.O.B. in lieu of Level..
Read More
Jigaon LIS
Water Resources and Irrigation
The Stage wise Lift Irrigation Scheme in LIS Group No. 5 (LIS No.7)
Read More
Parnai Hydro Electric Project (Hep) – 37.5 Mw
Parnai Hydro Electric is a Project by Jammu & Kashmir..
Read More
Gaddi Goddam, Nagpur Open Web Girder
Bridges/Railways / Metro Segment
Asia’s one of a kind and heaviest four-way multilayered steel bridge
Read More

Pulgaon Barrage
Dam Gates/Water Resources and Irrigation
Government of Maharashtra, VIDC Nagpur, had proposed construction of Barrage on Wardha River.
Read More


Lower Wardha Project
Dam Gates/Water Resources and Irrigation
The Project is proposed on Wardha River under..
Read More

Jigaon Dam Project
Dam Gates/Water Resources and Irrigation
The Jigaon Project is one of the major project in Vidarbha Region
Read More
Godhani to Kalmna Doubling of Nagpur Division of SECR
Godhni Kalamna doubling project was initiated to enable
Read More
OUR TRACK RECORD AND WORKS EXECUTED
Sr. No. | Name of Work | Year | Client | Contract Value (In Crores) | Status | Category |
---|---|---|---|---|---|---|
1 |
Work of Fabrication supply, Erection, testing & Commissioning of 10 Nos. of 12 Mtr X 4.5Mtr vertical gates and allied equipment on Chehdi Barrage, Nashik. |
2005 |
Executive Engineer, Water supply Dept, NMC, Nashik |
7.03cr |
Completed |
Dam Gate |
2 |
Construction of Earth Work and Cuts Cover of KM 76 to 77 of Goshikhurd Project. |
2012 |
Executive Engineer, Goshikhurd RBC Div, Bhramapuri |
52.63cr |
Completed |
Infra |
3 |
Construction of Rising Main & Approach Road for Satrapur L.I.S. |
2012 |
Executive Engineer, Irrigation Project Div, Nagpur |
21.16cr |
Completed |
LIS |
4 |
Manufacturing and Erection of Radial Gates, Hoist, Goliath Crane and River Sluice of Spillway of Lower Wardha Project. |
2013 |
Executive Engineer, Lower Wardha Project Div, Wardha |
32.75cr |
Completed |
Dam Gate |
5 |
Construction &Providing & Installation Vertically Lift Type Barrage Gate for Lower Chul Band Project. (Sakoli) |
2016 |
Executive Engineer, Medium Project Div, Gondia |
15.71cr |
Completed |
Dam Gate |
6 |
Construction of Approach Channel, Pump House, Rising main & all allied works of Haldi Purani Lift Irrigation Scheme Tah. Chamorshi Dist. Gadchiroli. |
2021 |
Executive Engineer, Gadchiroli Irrigation Div, Gadchiroli |
21.61cr |
Completed |
LIS |
7 |
Providing, Supplying, Installation & Testing of Air Vessel along with air Valves (Anti Surge Equipment's) for Rising Main of Borghat Lift Irrigation Scheme No.1 |
2020 |
Executive Engineer, Minor Irrigation Div, Chandrapur |
2.44cr |
Completed |
LIS |
8 |
Design, Manufacturing, Supply, Erection, Testing & Commissioning of Surge Protection Equipment for Rising Main Having dia 1300 mm & length 5500 m with kinetic double orifice type air valve at Tedhwa Shiwni Lift Irrigation Scheme |
2020 |
Executive Engineer, Mechanical Eng Workshop Div, Nagpur |
1.49cr |
Completed |
LIS |
9 |
Fabrication & Erection of Spilway Radial Gates, Stoplog Gates, Hoisting Arrangements, Goliath Crane & Railing Arrangements At Jigaon Project |
In Progress |
Executive Engineer, Jigaon Project Dam & Rehabilitation Div, Shegaon |
18.66cr |
In Progress |
Dam Gate |
10 |
Construction of Pump house with Pumping Machinery, EOT crane & switch yard, construction of rising main with manifold, Water hammer control device, construction of delivery chamber & balancing tank for stage wise of independent scheme of LIS group No.5 (LIS No.7) of Jigaon Project. |
In Progress |
Executive Engineer, Jigaon Lift Irrigation Div, Khamgaon |
97.02cr |
In Progress |
LIS |
11 |
Kanhan River (Kochi Barrage) Supply of Vertical Lift Gate and Fabrication &Erection, Pylon Str.& Allied work with Embedment & Hoist Bridge. |
In Progress |
Executive Engineer, Irrigation Project Div, Nagpur |
81.63cr |
In Progress |
LIS |
12 |
Construction of Sarra Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II |
Completed |
Executive Engineer, Lift Irrigation Project Div, Tirora |
42.99cr |
Completed |
LIS |
13 |
Construction of Bodhalkasa Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II |
In Progress |
Executive Engineer, Lift Irrigation Project div, Tirora |
63.39cr |
In Progress |
LIS |
14 |
Construction of Approach Channel, Gated intake structure, Forebay, Pump House, Manifold, Rising main, Distribution Chamber & all allied works of Talodhi Mokasa L.I.S. |
In Progress |
Executive Engineer, Minor Irrigation Div, Chandrapur |
18.18cr |
In Progress |
LIS |
15 |
Construction of Engineering, Procurement & Construction for Execution of Shivnala Lift Irrigation Scheme Under Gosikhurd# Project |
In Progress |
Executive Engineer, Ambhora Lift Irrigation Div, Bhiwapur |
97.65cr |
In Progress |
LIS |
16 |
Supply, Fabrication & Erection of Vertical Lift gate, Stoplog Gate, Pylon Structure, Hoist and Allied Work of Dindora Barrage Project, Tah. Warora, Dist. Chandrapur (WRD) |
In Progress |
Executive Engineer, Medium Project Div, Chandrapur |
90.81cr |
In Progress |
Dam Gate |
17 |
Construction of ROB at manned L.C.No. 103/AT Railway km 790/11-4 on Seldoh Sindi (Rly) Kandhali Road SH 330 in km 5/400 Tah. Seloo Dist Wardha. |
Completed |
Executive Engineer, PWD, Wardha |
7.48cr |
Completed |
Railways |
18 |
Execution of Earthwork in Formation, Construction of Major & Minor Bridges, Supply of Machine Crushed Stone Ballast, Execution of P.Way Work and other miscellenious works between Godhani to Kalumna Doubling of Nagpur Division of South East Central Railway |
Completed |
DY Chief Eng (Con), Southern Eastern Central Railway, Nagpur |
23.36cr |
Completed |
Railways |
19 |
Construction of High Level Bridge across Rive Sone at Chahikala including its Approaches on Kone Nakatwar Ranidih Road in Sonebhadra District of Uttar Pradesh on EPC Mode. |
In Progress |
Executive Engineer, Construction Div -2, PWD, Sonabhadra |
50 cr |
In Progress |
Bridges |
20 |
Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock) |
In Progress |
Meghalaya Power Generation Corporation Limited, Meghalaya |
9 cr |
In Progress |
Hydropower |
21 |
H.M. Works of Parnai Hydro Electric Project (3X12.5 MW) |
In Progress |
Jammu & Kashmir State Power Distribution Corp, JnK |
55.19cr |
In Progress |
Hydropower |