Arun-3 Hydroelectric Project (900 MW), Nepal

Project information

    Category: Hydropower

  • Project Name: Arun-3 Hydroelectric Project (900 MW), Nepal

Arun-3 Hydroelectric Project (900 MW), Nepal

SJVN Arun-3 Power Development Company (P) Ltd. (SAPDC), a company promoted by SJVN Ltd., as a single shareholder company in Nepal has signed Project Development Agreement with Government of Nepal to plan, promote, organize & execute Arun-3 Hydroelectric Project (900 MW) in Sankhwasabha District. of Nepal on Build, own, operate and transfer (BOOT) basis & the SAPDC has awarded the Contract of Package C5 – “Hydro-mechanical Works – Pressure Shaft Steel Liner of Arun-3 HEP” to us.

The Scope of Work includes procurement, fabrication, shop assembly, painting, testing, transportation, supply, erection, site testing and commissioning of pressure shaft steel liner of Arun-3 Hydroelectric project. The Pressure Shaft Steel liner comprises Two (2) sets of Pressure Shaft Steel Liner of dia. 5500mm, Bifurcations (2 Nos), Branches (4 Nos) of dia. 4000mm and their accessories, complete in all respects.

Arun-3 Hydroelectric project is located on River Arun, which is one of the main tributaries of River SaptKosi near Num village of Sankhuwasabha District in Nepal. The Project has been contemplated as a run-of-river scheme which envisages about 70 m high concrete gravity dam.