ICONIC PROJECTS

Hadgaon Barrage

Dam Gates

This flagship project showcases our engineering excellence with advanced dam gates.

Read More

Sindi ROB

Railways / Metro Segment

Composite girders for ROB for Sindhi Railway

Read More

Koradi Power Plant

Thermal Power

This state-of-the-art Thermal Power Station not only signifies our expertise in energy infrastructure

Read More

Dhukwan Project

Hydropower

This project stands as a shining example of our proficiency in Hydropower Station development.

Read More

Nerla Air Vessel

Water Resources and Irrigation

This project is a testament to our development of Water Resources and Irrigation Systems.

Read More

Shivnala Lift Irrigation Scheme

Water Resources and Irrigation

Shivnala LIS is an Engineering, Procurement and Construction

Read More

Chandur Railway Project (ROB)

Bridges/Railways / Metro Segment

This project marks a remarkable achievement by us. It exemplifies our excellence in Railway Over Bridge construction.

Read More

Jigaon LIS

Water Resources and Irrigation

This project serves as evidence of our accomplishments in the fields of irrigation and water resources.

Read More

Parnai Hydro Electric Project (Hep) – 37.5 Mw

Hydropower

This project stands as a prime example of our success in the field of Hydropower Stations.

Read More

Gaddi Goddam, Nagpur Open Web Girder

Bridges/Railways / Metro Segment

This project is a shining success of our group’s portfolio, showcasing our excellence in multilayered steel bridge construction.

Read More

Sadar Launching Bridge

Railways / Metro Segment

This project is a testament to our success in Steel Truss Launching Girder construction.

Read More

Pulgaon Barrage

Dam Gates/Water Resources and Irrigation

This project stands as a remarkable achievement in our portfolio, emphasizing our expertise in dam gate construction.

Read More

National Cancer Institute

Pre Engineered Building(PEB)

This project is a testament to our success in Pre-Engineered Building construction.

Read More

Buldi metro

Railways / Metro Segment

This project is a prime example of our success in Steel Truss Bridge construction.

Read More

Lower Wardha Project

Dam Gates/Water Resources and Irrigation

This project is a testament to our success in the manufacturing and erection of various critical

Read More

High Level Bridge across Sone River

Bridges

This projects stands as a prime example of our expertise in bridge construction.

Read More

Jigaon Dam Project

Dam Gates/Water Resources and Irrigation

This project underscores our expertise in the fabrication and erection of critical infrastructure

Read More

Godhani to Kalmna Doubling of Nagpur Division of SECR

Railways / Metro Segment

This project spearheaded by us successfully facilitated two-way traffic between Kalamna station

Read More

Ganol SHP – 3 * 7.5 MW

Hydropower

This project stands as a testament to our success in hydropower station construction.

Read More

OUR TRACK RECORD AND WORKS EXECUTED

Sr. No. Name of Work Year Client Contract Value (In Crores) Status Category

1

Work of Fabrication supply, Erection, testing & Commissioning of 10 Nos. of 12 Mtr X 4.5Mtr vertical gates and allied equipment on Chehdi Barrage, Nashik.

2005

Executive Engineer, Water supply Dept, NMC, Nashik

7.03cr

Completed

Dam Gate

2

Construction of Earth Work and Cuts Cover of KM 76 to 77 of Goshikhurd Project.

2012

Executive Engineer, Goshikhurd RBC Div, Bhramapuri

52.63cr

Completed

Infra

3

Construction of Rising Main & Approach Road for Satrapur L.I.S.

2012

Executive Engineer, Irrigation Project Div, Nagpur

21.16cr

Completed

LIS

4

Manufacturing and Erection of Radial Gates, Hoist, Goliath Crane and River Sluice of Spillway of Lower Wardha Project.

2013

Executive Engineer, Lower Wardha Project Div, Wardha

32.75cr

Completed

Dam Gate

5

Construction &Providing & Installation Vertically Lift Type Barrage Gate for Lower Chul Band Project. (Sakoli)

2016

Executive Engineer, Medium Project Div, Gondia

15.71cr

Completed

Dam Gate

6

Construction of Approach Channel, Pump House, Rising main & all allied works of Haldi Purani Lift Irrigation Scheme Tah. Chamorshi Dist. Gadchiroli.

2021

Executive Engineer, Gadchiroli Irrigation Div, Gadchiroli

21.61cr

Completed

LIS

7

Providing, Supplying, Installation & Testing of Air Vessel along with air Valves (Anti Surge Equipment's) for Rising Main of Borghat Lift Irrigation Scheme No.1

2020

Executive Engineer, Minor Irrigation Div, Chandrapur

2.44cr

Completed

LIS

8

Design, Manufacturing, Supply, Erection, Testing & Commissioning of Surge Protection Equipment for Rising Main Having dia 1300 mm & length 5500 m with kinetic double orifice type air valve at Tedhwa Shiwni Lift Irrigation Scheme

2020

Executive Engineer, Mechanical Eng Workshop Div, Nagpur

1.49cr

Completed

LIS

9

Fabrication & Erection of Spilway Radial Gates, Stoplog Gates, Hoisting Arrangements, Goliath Crane & Railing Arrangements At Jigaon Project

2007

Executive Engineer, Jigaon Project Dam & Rehabilitation Div, Shegaon

18.66cr

In Progress

Dam Gate

10

Construction of Pump house with Pumping Machinery, EOT crane & switch yard, construction of rising main with manifold, Water hammer control device, construction of delivery chamber & balancing tank for stage wise of independent scheme of LIS group No.5 (LIS No.7) of Jigaon Project.

2009

Executive Engineer, Jigaon Lift Irrigation Div, Khamgaon

97.02cr

Completed

LIS

11

Kanhan River (Kochi Barrage) Supply of Vertical Lift Gate and Fabrication &Erection, Pylon Str.& Allied work with Embedment & Hoist Bridge.

2009

Executive Engineer, Irrigation Project Div, Nagpur

81.63cr

In Progress

LIS

12

Construction of Sarra Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II

2018

Executive Engineer, Lift Irrigation Project Div, Tirora

42.99cr

Completed

LIS

13

Construction of Bodhalkasa Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II

2018

Executive Engineer, Lift Irrigation Project div, Tirora

63.39cr

Completed

LIS

14

Construction of Approach Channel, Gated intake structure, Forebay, Pump House, Manifold, Rising main, Distribution Chamber & all allied works of Talodhi Mokasa L.I.S.

2019

Executive Engineer, Minor Irrigation Div, Chandrapur

18.18cr

In Progress

LIS

15

Construction of Engineering, Procurement & Construction for Execution of Shivnala Lift Irrigation Scheme Under Gosikhurd# Project

2020

Executive Engineer, Ambhora Lift Irrigation Div, Bhiwapur

97.65cr

Completed

LIS

16

Supply, Fabrication & Erection of Vertical Lift gate, Stoplog Gate, Pylon Structure, Hoist and Allied Work of Dindora Barrage Project, Tah. Warora, Dist. Chandrapur (WRD)

2012

Executive Engineer, Medium Project Div, Chandrapur

90.81cr

In Progress

Dam Gate

17

Construction of ROB at manned L.C.No. 103/AT Railway km 790/11-4 on Seldoh Sindi (Rly) Kandhali Road SH 330 in km 5/400 Tah. Seloo Dist Wardha.

Completed

Executive Engineer, PWD, Wardha

7.48cr

Completed

Railways

18

Execution of Earthwork in Formation, Construction of Major & Minor Bridges, Supply of Machine Crushed Stone Ballast, Execution of P.Way Work and other miscellenious works between Godhani to Kalumna Doubling of Nagpur Division of South East Central Railway

2018

DY Chief Eng (Con), Southern Eastern Central Railway, Nagpur

23.36cr

Completed

Railways

19

Construction of High Level Bridge across Rive Sone at Chahikala including its Approaches on Kone Nakatwar Ranidih Road in Sonebhadra District of Uttar Pradesh on EPC Mode.

2017

Executive Engineer, Construction Div -2, PWD, Sonabhadra

50 cr

Completed

Bridges

20

Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock)

2018

Meghalaya Power Generation Corporation Limited, Meghalaya

9 cr

Completed

Hydropower

21

H.M. Works of Parnai Hydro Electric Project (3X12.5 MW)

In Progress

Jammu & Kashmir State Power Distribution Corp, JnK

55.19cr

In Progress

Hydropower

22

Construction of Balance Work Of Pump house with pumping machinery,E O T crane & switch yard, Construction of Rising Main with manifolds, water hammer control device, construction of delivery chamber & Balancing tank for stage wise or independent scheme of L.I.S. Group No.2 (L.I.S.No. 2. ) of Jigaon Project

2022

Executive Engineer, Minor Irrigation Div, Chandrapur

28.57cr

In Progress

LIS

20

Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock)

2018

Meghalaya Power Generation Corporation Limited, Meghalaya

9 cr

Completed

Hydropower

23

Pipe Distribution work of Talodhi Mokasa LIS

2022

Executive Engineer, Minor Irrigation Div, Chandrapur

117.87cr

In Progress

LIS