ICONIC PROJECTS

Sindi ROB

Railways / Metro Segment

Composite girders for ROB for Sindhi Railway

Read More

Dhukwan Project

Hydropower

This Hydro-Mechanical work consists of Manufacturing, Supply,

Read More

Nerla Air Vessel

Water Resources and Irrigation

Construction & Installation of Air Vessel (4 Nos.)

Read More

Shivnala Lift Irrigation Scheme

Water Resources and Irrigation

Shivnala LIS is an Engineering, Procurement and Construction

Read More

Chandur Railway Project (ROB)

Bridges/Railways / Metro Segment

Work of Construction of R.O.B. in lieu of Level..

Read More

Jigaon LIS

Water Resources and Irrigation

The Stage wise Lift Irrigation Scheme in LIS Group No. 5 (LIS No.7)

Read More

Parnai Hydro Electric Project (Hep) – 37.5 Mw

Hydropower

Parnai Hydro Electric is a Project by Jammu & Kashmir..

Read More

Gaddi Goddam, Nagpur Open Web Girder

Bridges/Railways / Metro Segment

Asia’s one of a kind and heaviest four-way multilayered steel bridge

Read More

Sadar Launching Bridge

Railways / Metro Segment

Manufactured & Supplied Steel Truss Launching Girder of 40 Mtr

Read More

Pulgaon Barrage

Dam Gates/Water Resources and Irrigation

Government of Maharashtra, VIDC Nagpur, had proposed construction of Barrage on Wardha River.

Read More

National Cancer Institute

Pre Engineered Building(PEB)

National Cancer Institute, Nagpur is proposed as a state…..

Read More

Buldi metro

Railways / Metro Segment

Manufactured & Supplied Steel Truss Bridge Girder of 36 Mtr

Read More

Lower Wardha Project

Dam Gates/Water Resources and Irrigation

The Project is proposed on Wardha River under..

Read More

High Level Bridge across Sone River

Bridges

This Tender envisages to construct a High Level…

Read More

Jigaon Dam Project

Dam Gates/Water Resources and Irrigation

The Jigaon Project is one of the major project in Vidarbha Region

Read More

Ganol SHP – 3 * 7.5 MW

Hydropower

The Ganol Small Hydro Power Project, a Project by Meghalaya Power…

Read More

OUR TRACK RECORD AND WORKS EXECUTED

Sr. No. Name of Work Year Client Contract Value (In Crores) Status Category

1

Work of Fabrication supply, Erection, testing & Commissioning of 10 Nos. of 12 Mtr X 4.5Mtr vertical gates and allied equipment on Chehdi Barrage, Nashik.

2005

Executive Engineer, Water supply Dept, NMC, Nashik

7.03cr

Completed

Dam Gate

2

Construction of Earth Work and Cuts Cover of KM 76 to 77 of Goshikhurd Project.

2012

Executive Engineer, Goshikhurd RBC Div, Bhramapuri

52.63cr

Completed

Infra

3

Construction of Rising Main & Approach Road for Satrapur L.I.S.

2012

Executive Engineer, Irrigation Project Div, Nagpur

21.16cr

Completed

LIS

4

Manufacturing and Erection of Radial Gates, Hoist, Goliath Crane and River Sluice of Spillway of Lower Wardha Project.

2013

Executive Engineer, Lower Wardha Project Div, Wardha

32.75cr

Completed

Dam Gate

5

Construction &Providing & Installation Vertically Lift Type Barrage Gate for Lower Chul Band Project. (Sakoli)

2016

Executive Engineer, Medium Project Div, Gondia

15.71cr

Completed

Dam Gate

6

Construction of Approach Channel, Pump House, Rising main & all allied works of Haldi Purani Lift Irrigation Scheme Tah. Chamorshi Dist. Gadchiroli.

2021

Executive Engineer, Gadchiroli Irrigation Div, Gadchiroli

21.61cr

Completed

LIS

7

Providing, Supplying, Installation & Testing of Air Vessel along with air Valves (Anti Surge Equipment's) for Rising Main of Borghat Lift Irrigation Scheme No.1

2020

Executive Engineer, Minor Irrigation Div, Chandrapur

2.44cr

Completed

LIS

8

Design, Manufacturing, Supply, Erection, Testing & Commissioning of Surge Protection Equipment for Rising Main Having dia 1300 mm & length 5500 m with kinetic double orifice type air valve at Tedhwa Shiwni Lift Irrigation Scheme

2020

Executive Engineer, Mechanical Eng Workshop Div, Nagpur

1.49cr

Completed

LIS

9

Fabrication & Erection of Spilway Radial Gates, Stoplog Gates, Hoisting Arrangements, Goliath Crane & Railing Arrangements At Jigaon Project

In Progress

Executive Engineer, Jigaon Project Dam & Rehabilitation Div, Shegaon

18.66cr

In Progress

Dam Gate

10

Construction of Pump house with Pumping Machinery, EOT crane & switch yard, construction of rising main with manifold, Water hammer control device, construction of delivery chamber & balancing tank for stage wise of independent scheme of LIS group No.5 (LIS No.7) of Jigaon Project.

In Progress

Executive Engineer, Jigaon Lift Irrigation Div, Khamgaon

97.02cr

In Progress

LIS

11

Kanhan River (Kochi Barrage) Supply of Vertical Lift Gate and Fabrication &Erection, Pylon Str.& Allied work with Embedment & Hoist Bridge.

In Progress

Executive Engineer, Irrigation Project Div, Nagpur

81.63cr

In Progress

LIS

12

Construction of Sarra Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II

Completed

Executive Engineer, Lift Irrigation Project Div, Tirora

42.99cr

Completed

LIS

13

Construction of Bodhalkasa Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II

In Progress

Executive Engineer, Lift Irrigation Project div, Tirora

63.39cr

In Progress

LIS

14

Construction of Approach Channel, Gated intake structure, Forebay, Pump House, Manifold, Rising main, Distribution Chamber & all allied works of Talodhi Mokasa L.I.S.

In Progress

Executive Engineer, Minor Irrigation Div, Chandrapur

18.18cr

In Progress

LIS

15

Construction of Engineering, Procurement & Construction for Execution of Shivnala Lift Irrigation Scheme Under Gosikhurd# Project

In Progress

Executive Engineer, Ambhora Lift Irrigation Div, Bhiwapur

97.65cr

In Progress

LIS

16

Supply, Fabrication & Erection of Vertical Lift gate, Stoplog Gate, Pylon Structure, Hoist and Allied Work of Dindora Barrage Project, Tah. Warora, Dist. Chandrapur (WRD)

In Progress

Executive Engineer, Medium Project Div, Chandrapur

90.81cr

In Progress

Dam Gate

17

Construction of ROB at manned L.C.No. 103/AT Railway km 790/11-4 on Seldoh Sindi (Rly) Kandhali Road SH 330 in km 5/400 Tah. Seloo Dist Wardha.

Completed

Executive Engineer, PWD, Wardha

7.48cr

Completed

Railways

18

Execution of Earthwork in Formation, Construction of Major & Minor Bridges, Supply of Machine Crushed Stone Ballast, Execution of P.Way Work and other miscellenious works between Godhani to Kalumna Doubling of Nagpur Division of South East Central Railway

Completed

DY Chief Eng (Con), Southern Eastern Central Railway, Nagpur

23.36cr

Completed

Railways

19

Construction of High Level Bridge across Rive Sone at Chahikala including its Approaches on Kone Nakatwar Ranidih Road in Sonebhadra District of Uttar Pradesh on EPC Mode.

In Progress

Executive Engineer, Construction Div -2, PWD, Sonabhadra

50 cr

In Progress

Bridges

20

Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock)

In Progress

Meghalaya Power Generation Corporation Limited, Meghalaya

9 cr

In Progress

Hydropower

21

H.M. Works of Parnai Hydro Electric Project (3X12.5 MW)

In Progress

Jammu & Kashmir State Power Distribution Corp, JnK

55.19cr

In Progress

Hydropower