Arun-3 Hydroelectric Project (900 MW), Nepal
SJVN Arun-3 Power Development Company (P) Ltd. (SAPDC), a company promoted by SJVN Ltd., as a single shareholder company in Nepal
Read More
Katepurna Barrage
The Katepurna Barrage Project, located in Akola District, Maharashtra, is a key water infrastructure initiative designed to enhance irrigation, water conservation, and sustainable resource management across the region.
Read More
Bodalkasa Rising Main
Water Resources and Irrigation
The Bodalkasa Rising Main Project is a vital water resources and irrigation infrastructure initiative designed to ensure the efficient transmission of water for irrigation and regional water supply.
Read More
Hadgaon Barrage
The Hadgaon Barrage Project is a significant water resources infrastructure development focused on effective water storage, regulation, and irrigation management.
Read More
Koradi Power Plant
The Koradi Thermal Power Plant Project is a landmark energy infrastructure development that plays a crucial role in meeting the growing power demands of Maharashtra.
Read More
Dhukwan Project
The Dhukwan Hydropower Project is a significant renewable energy initiative that demonstrates SSFM Group’s expertise in delivering high-quality engineering solutions for hydropower infrastructure.
Read More
Nerla Air Vessel
Water Resources and Irrigation
The Nerla Air Vessel Project is a critical component of modern water resources and irrigation infrastructure, designed to enhance the safety, efficiency, and reliability of high-pressure pipeline systems.
Read More
Shivnala Lift Irrigation Scheme
Water Resources and Irrigation
The Shivnala Lift Irrigation Scheme (LIS) is a major Engineering, Procurement, and Construction (EPC) project developed to improve water distribution and irrigation efficiency for agricultural development.
Read More
Chandur Railway Project (ROB)
Bridges/Railways / Metro Segment
This project marks a remarkable achievement by us. It exemplifies our excellence in Railway Over Bridge construction.
Read More
Jigaon LIS
Water Resources and Irrigation
This project serves as evidence of our accomplishments in the fields of irrigation and water resources.
Read More
Parnai Hydro Electric Project (Hep) – 37.5 Mw
This project stands as a prime example of our success in the field of Hydropower Stations.
Read More
Gaddi Goddam, Nagpur Open Web Girder
Bridges/Railways / Metro Segment
This project is a shining success of our group’s portfolio, showcasing our excellence in multilayered steel bridge construction.
Read More
Sadar Launching Bridge
This project is a testament to our success in Steel Truss Launching Girder construction.
Read More
Pulgaon Barrage
Dam Gates/Water Resources and Irrigation
This project stands as a remarkable achievement in our portfolio, emphasizing our expertise in dam gate construction.
Read More
National Cancer Institute
The National Cancer Institute (NCI) Project is a prestigious healthcare infrastructure development aimed at providing world-class medical facilities and advanced cancer treatment services.
Read More
Buldi Metro
The Buldi Metro Project is an important urban transportation infrastructure initiative aimed at enhancing public transit, improving connectivity,
Read More
Lower Wardha Project
Dam Gates/Water Resources and Irrigation
The Lower Wardha Project is a major water resources and irrigation initiative developed to improve water storage, irrigation efficiency, and sustainable water management across the region.
Read More
High Level Bridge across Sone River
The High Level Bridge across the Sone River is a landmark infrastructure project designed to enhance regional connectivity and facilitate the safe and efficient movement of road and rail traffic.
Read More
Jigaon Dam Project
Dam Gates/Water Resources and Irrigation
This project underscores our expertise in the fabrication and erection of critical infrastructure
Read More
Godhani to Kalmna Doubling of Nagpur Division of SECR
The Godhani to Kalmna Doubling Project in the Nagpur Division of South East Central Railway (SECR) is a major railway infrastructure initiative aimed at increasing rail capacity,
Read More
Ganol SHP – 3 * 7.5 MW
The Ganol Small Hydropower Project (3 × 7.5 MW) is a renewable energy initiative developed to harness clean hydroelectric power while promoting sustainable energy generation.
Read MoreOUR TRACK RECORD AND WORKS EXECUTED
| Sr. No. | Name of Work | Year | Client | Contract Value (In Crores) | Status | Category |
|---|---|---|---|---|---|---|
|
1 |
Work of Fabrication supply, Erection, testing & Commissioning of 10 Nos. of 12 Mtr X 4.5Mtr vertical gates and allied equipment on Chehdi Barrage, Nashik. |
2005 |
Executive Engineer, Water supply Dept, NMC, Nashik |
7.03cr |
Completed |
Dam Gate |
|
2 |
Construction of Earth Work and Cuts Cover of KM 76 to 77 of Goshikhurd Project. |
2012 |
Executive Engineer, Goshikhurd RBC Div, Bhramapuri |
52.63cr |
Completed |
Infra |
|
3 |
Construction of Rising Main & Approach Road for Satrapur L.I.S. |
2012 |
Executive Engineer, Irrigation Project Div, Nagpur |
21.16cr |
Completed |
LIS |
|
4 |
Manufacturing and Erection of Radial Gates, Hoist, Goliath Crane and River Sluice of Spillway of Lower Wardha Project. |
2013 |
Executive Engineer, Lower Wardha Project Div, Wardha |
32.75cr |
Completed |
Dam Gate |
|
5 |
Construction &Providing & Installation Vertically Lift Type Barrage Gate for Lower Chul Band Project. (Sakoli) |
2016 |
Executive Engineer, Medium Project Div, Gondia |
15.71cr |
Completed |
Dam Gate |
|
6 |
Construction of Approach Channel, Pump House, Rising main & all allied works of Haldi Purani Lift Irrigation Scheme Tah. Chamorshi Dist. Gadchiroli. |
2021 |
Executive Engineer, Gadchiroli Irrigation Div, Gadchiroli |
21.61cr |
Completed |
LIS |
|
7 |
Providing, Supplying, Installation & Testing of Air Vessel along with air Valves (Anti Surge Equipment's) for Rising Main of Borghat Lift Irrigation Scheme No.1 |
2020 |
Executive Engineer, Minor Irrigation Div, Chandrapur |
2.44cr |
Completed |
LIS |
|
8 |
Design, Manufacturing, Supply, Erection, Testing & Commissioning of Surge Protection Equipment for Rising Main Having dia 1300 mm & length 5500 m with kinetic double orifice type air valve at Tedhwa Shiwni Lift Irrigation Scheme |
2020 |
Executive Engineer, Mechanical Eng Workshop Div, Nagpur |
1.49cr |
Completed |
LIS |
|
9 |
Fabrication & Erection of Spilway Radial Gates, Stoplog Gates, Hoisting Arrangements, Goliath Crane & Railing Arrangements At Jigaon Project |
2007 |
Executive Engineer, Jigaon Project Dam & Rehabilitation Div, Shegaon |
18.66cr |
In Progress |
Dam Gate |
|
10 |
Construction of Pump house with Pumping Machinery, EOT crane & switch yard, construction of rising main with manifold, Water hammer control device, construction of delivery chamber & balancing tank for stage wise of independent scheme of LIS group No.5 (LIS No.7) of Jigaon Project. |
2009 |
Executive Engineer, Jigaon Lift Irrigation Div, Khamgaon |
97.02cr |
Completed |
LIS |
|
11 |
Kanhan River (Kochi Barrage) Supply of Vertical Lift Gate and Fabrication &Erection, Pylon Str.& Allied work with Embedment & Hoist Bridge. |
2009 |
Executive Engineer, Irrigation Project Div, Nagpur |
81.63cr |
In Progress |
LIS |
|
12 |
Construction of Sarra Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II |
2018 |
Executive Engineer, Lift Irrigation Project Div, Tirora |
42.99cr |
Completed |
LIS |
|
13 |
Construction of Bodhalkasa Rising Main from R.D. 8510.00 m to R.D. 19930.00 M. Works of Dhapewada Lift Irrigation State –II |
2018 |
Executive Engineer, Lift Irrigation Project div, Tirora |
63.39cr |
Completed |
LIS |
|
14 |
Construction of Approach Channel, Gated intake structure, Forebay, Pump House, Manifold, Rising main, Distribution Chamber & all allied works of Talodhi Mokasa L.I.S. |
2019 |
Executive Engineer, Minor Irrigation Div, Chandrapur |
18.18cr |
In Progress |
LIS |
|
15 |
Construction of Engineering, Procurement & Construction for Execution of Shivnala Lift Irrigation Scheme Under Gosikhurd# Project |
2020 |
Executive Engineer, Ambhora Lift Irrigation Div, Bhiwapur |
97.65cr |
Completed |
LIS |
|
16 |
Supply, Fabrication & Erection of Vertical Lift gate, Stoplog Gate, Pylon Structure, Hoist and Allied Work of Dindora Barrage Project, Tah. Warora, Dist. Chandrapur (WRD) |
2012 |
Executive Engineer, Medium Project Div, Chandrapur |
90.81cr |
In Progress |
Dam Gate |
|
17 |
Construction of ROB at manned L.C.No. 103/AT Railway km 790/11-4 on Seldoh Sindi (Rly) Kandhali Road SH 330 in km 5/400 Tah. Seloo Dist Wardha. |
Completed |
Executive Engineer, PWD, Wardha |
7.48cr |
Completed |
Railways |
|
18 |
Execution of Earthwork in Formation, Construction of Major & Minor Bridges, Supply of Machine Crushed Stone Ballast, Execution of P.Way Work and other miscellenious works between Godhani to Kalumna Doubling of Nagpur Division of South East Central Railway |
2018 |
DY Chief Eng (Con), Southern Eastern Central Railway, Nagpur |
23.36cr |
Completed |
Railways |
|
19 |
Construction of High Level Bridge across Rive Sone at Chahikala including its Approaches on Kone Nakatwar Ranidih Road in Sonebhadra District of Uttar Pradesh on EPC Mode. |
2017 |
Executive Engineer, Construction Div -2, PWD, Sonabhadra |
50 cr |
Completed |
Bridges |
|
20 |
Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock) |
2018 |
Meghalaya Power Generation Corporation Limited, Meghalaya |
9 cr |
Completed |
Hydropower |
|
21 |
H.M. Works of Parnai Hydro Electric Project (3X12.5 MW) |
In Progress |
Jammu & Kashmir State Power Distribution Corp, JnK |
55.19cr |
In Progress |
Hydropower |
|
22 |
Construction of Balance Work Of Pump house with pumping machinery,E O T crane & switch yard, Construction of Rising Main with manifolds, water hammer control device, construction of delivery chamber & Balancing tank for stage wise or independent scheme of L.I.S. Group No.2 (L.I.S.No. 2. ) of Jigaon Project |
2022 |
Executive Engineer, Minor Irrigation Div, Chandrapur |
28.57cr |
In Progress |
LIS |
|
20 |
Ganol SHP – 3X7.5 MW in West garo Hills District , Meghalaya Project (HM works of Pressure Shaft & Penstock) |
2018 |
Meghalaya Power Generation Corporation Limited, Meghalaya |
9 cr |
Completed |
Hydropower |
|
23 |
Pipe Distribution work of Talodhi Mokasa LIS |
2022 |
Executive Engineer, Minor Irrigation Div, Chandrapur |
117.87cr |
In Progress |
LIS |